Projects:EASA PPL/Operational Procedures
Appearance
- Special VFR: min 3km visibility
- Runway contaminated: 25% compacted snow
- ELT - emergency locator transmitter: 48 hours
| Water | Foam | CO2 | Dry Powder | Halon | BCF | |
|---|---|---|---|---|---|---|
| A - solids | x | x | (x) | x | x | |
| B - liquids | x | x | x | x | ||
| C - gasses | x | x | x | |||
| D - metals | x | |||||
| E - electrical | x | x | x | |||
| F - fats&oils |
| prev | me | ||
|---|---|---|---|
| H | H | 2min | 4nm / 7.4km |
| H | M | 2min | 5nm / 9.3km |
| H/M | L | 3min | 9.3km / 5nm |